Current Dev Position: YP 3.1 M1
Next Deadline: YP 3.1 M1 build Dec. 2, 2019
Next Team Meetings:
* Bug Triage meeting Thursday Dec. 12th at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
* Monthly Project Meeting Tuesday Jan. 7th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Twitch - Next event is Tuesday Dec. 17th at 8am PDT (
<https://www.twitch.tv/yocto_project> https://www.twitch.tv/yocto_project)
Key Status/Updates:
* YP 3.0.1 was released.
* Python 2.x has been removed from HOSTTOOLS so OE-Core is python2 use
free.
* Hash Equivalency has been enabled by default for poky using a local
server.
* YP 3.1 M1 was due to be built but issues have been encountered in
the release builds, both with previously unseen hash equivalence issue and a
ptest performance regression on the autobuilders. Both issues are being
worked on but are further delaying a successful M1 build.
* Intermittent build failures continue to hamper builds, particularly
combined with the above issues and as few people are available to attempt to
debug and resolve them.
* Patch review and testing has run into new issues with a number of
regressions from upgrades causing instability. Most of these were isolated
pre-merge but not all.
* The TSC is working on LTS plans, productive discussions have been
had and a new policy on handling this and stable releases should be
available in the coming weeks.
* We are continuing to collect ideas for YP 3.1 in this document:
<https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yj
nABc/edit?usp=sharing>
https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjn
ABc/edit?usp=sharing
* If anyone has any status items for the project they'd like to add to
the weekly reports, please email Richard and Stephen.
YP 3.1 Milestone Dates:
* YP 3.1 M1 build date 12/2/2019
* YP 3.1 M1 release date 12/13/2019
* YP 3.1 M2 build date 1/20/2020
* YP 3.1 M2 release date 1/31/2020
* YP 3.1 M3 build date 2/24/2020
* YP 3.1 M3 release date 3/6/2020
* YP 3.1 M4 build date 3/30/2020
* YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
* YP 3.0.1 is released.
* YP 2.7.3 build date 2/10/20
* YP 2.7.3 release date 2/21/20
* YP 3.0.2 build date 2/3/20
* YP 3.0.2 release date 2/14/20
Tracking Metrics:
* WDD 2698 (last week 2620) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
* Poky Patch Metrics
* Total patches found: 1410 (last week 1444)
* Patches in the Pending State: 564 (40%) [last week 571 (40%)]
The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:
<https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC
The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]
Thanks,
Stephen K. Jolley
Yocto Project Project Manager
* Cell: (208) 244-4460
* Email: sjolley.yp.pm at gmail.com
<mailto:sjolley.yp.pm at gmail.com>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.openembedded.org/pipermail/openembedded-core/attachments/20191210/32fe425b/attachment-0001.html>
More information about the Openembedded-core
mailing list